Our week in review: Admin & 3D modelling. Admin. I use this word to cover off a lot of tasks. Any time I make a phone call, write an email or do research about anything to do with the building of our Class Globe 5.80, I fill out my timesheet with the word Admin. It also involves things like writing this blog or planning etc. I am very careful to account for these kinds of activities as it all becomes part of the time component we invest into this project. 3D Modeling. Not much to report here other than the model continues to grow... See our Project Hours blog post for an up to date overview of our build hours.
2 Comments
Our week in review: CAD drawing, hardware sourcing, workspace set up. Although this was another 'full on' week of part time boat building, or preparation for it, it was one of those weeks where you look back at what you have done and realise that there is not much physical to show for it. Hatches. I spent quite a bit of time talking on the phone and sending emails regarding hatches. I found a great local company that not only has a standard line of deck hatches but they also produce custom sized options as well. In particular I was looking for something to use as a door for the water tight bulkhead D1. Cule Marine Ltd was able to offer two rectangular hatch options that would be great for this purpose. With cutout sizes of either 500mm x 700mm or 500mm x 850mm, getting in and out of this space just got easier! CAD drawing. I continue with building a 3D model of our Class Globe 5.80. For a whole host of reasons, this is a very important asset moving forward. Workspace set up. We did a little bit of work in the shed but not as much as we had liked. Still, paint is being applied to walls and beams, trim moulding is being made and some other small jobs are being taken care of. All good! See our Project Hours blog post for an up to date overview of our build hours.
Our week in review: Frame D1 and workspace set up. I spent time this week working through some of the finer details of bulkhead D1. In particular I wanted to define the size and orientation of the water tight hatch/door and the cutout size in the plywood. This means we can attach the structural elements that surround and support the opening permanently to the bulkhead structure as we build it. No need to come back later in the project and rework anything. It means the bulkhead can be completely finished on the bench before standing up on the strong back. We are opting not to build the forward bunk structure but to install a seagoing toilet instead. This means we can install a hatch/door that can be a little taller than it is wider because it will not need to clear a mattress when opening. Getting in and out will be easier and we can cruise the boat locally but still be able to enter official Class Globe 5.80 events when the opportunities arise. I have found a local company that can supply rectangular hatches with cut out dimensions of 500mm x 700mm or 500mm x 850mm. These images of bulkhead D1 show the larger of the two options. I have a few other things to think about in the space forward of bulkhead D1 that might affect the swing of the hatch but for now this version with the 850mm high hatch option looks like it could work. Because the hatch has to be fitted on the forward side of bulkhead D1, I will have to deviate from the plans as drawn and rework the gussets holding the framing joints together. This will provide the uniform surface needed to mount the hatch and tidy up the look of the structure on the forward face. Part of this rework will involve installing solid blocking in the gaps underneath the gussets. As drawn, the spaces behind the gussets become small pockets that not only will be tedious to finish but will also, over the long haul, collect dust, grim, possibly mould and the odd insect. The lower ones in particular are great spots for condensation to accumulate and if not thoroughly resin coated and painted are great spot for rot to begin. We will fit the extra infill blocking to all of the bulkheads of our Class Globe 5.80 to streamline both the construction, finishing and maintenance of these structural components. Our workspace continues to evolve as we finish walls and ceilings.
See our Project Hours blog post for an up to date overview of our build hours. |
AuthorSHusband & wife team building CG580 boat #71. Greg is a qualified professional boat builder, hobby musician & human potential advocate. Leanne is a retail business entrepreneur, kick ass soap maker & sourdough slave. We love adventure! Archives
September 2021
Categories
All
|